ARV Group


P.O. Box 174
6860 AD

Stationsweg 44a
6861 EJ Oosterbeek
The Netherlands

T +31(0)26-379 46 05
infoarvgroupcom

ARV Group 
1. professionals dedicated to helping professionals achieve lasting improvements by constructively analyzing existing operational patterns.
2. Also: specialists combining insider’s expertise with outsider’s “out of the box” vision
3. facilitators in not only becoming a market winner, but above all in staying a market winner.

Cases Quickchooser

Shin-Etsu
maintenance costs and processes receive a major overhaul ..
Refresco
dealing with dynamic ‘growing pains’..
Attero Energy & Services
performance management built into the company ‘DNA’ ..
Bolletje B.V. Almelo
improving on the old, preparing for the new ..
Akzo Nobel Surface Chemistry Mons
maintenance fine-tuned to face future demand ..
Colbond Nonwovens
tighter focus & increased reliability lead to higher profitability ..
Sara Lee CT&S
a performance management system, an ongoing coordinated ..
Akzo Nobel Surfactants - Stenungsund
capacity up, costs per kg down and daily operations smoothly on track..
Danone Numico Europe
Uniform continuous improvement operation..
Danone Nutricia Cuijk
Savings through Clarity ...
Royal FrieslandCampina Cheese CPC
Efficiency beyond the original targets…
Akzo Nobel Surfactants
40% boost in plant output capability....
Suiker Unie
successful shift in maintenance from..
BioMérieux
a 20% reduction in stocks...
Akzo Nobel MA/CC
Transformed into a performance-based organization...
Akzo Nobel Eka Chemicals
Millions of euros in beyond-target savings...

Case 7>

Savings through Clarity:

Danone Nutricia Cuijk

Essentials:

  • structural savings of nearly €3 million annually,
  • OEE boosts of 20 to 40% at two spray-driers and two packaging lines,
  • optimizations in purchasing & maintenance in place,
  • boost in continuous improvement practices as a spin-off.

The Danone Nutricia organization in Cuijk, the Netherlands (a European leader in powdered milk for infant nutrition) was faced with a series of urgent targets. Operating efficiency needed a boost, rationalizations had to be carried out in maintenance and purchasing. Supply-Point director Gert-Jan Hoogers contacted ARV Group for support.

ARV Group presented a plan tailored to the supply point's needs. The assessment showed that the plant could, in fact, achieve structural savings even more ambitious than what management had first considered feasible.

Performance management embedded

The "Clarity" project, as proposed by ARV Group, was based on a cost-savings program, including OEE improvement, waste reduction, purchasing optimization and cutting the cost of maintenance materials. All of this was enabled by the setting-up and "embedding" of a performance-management system, to provide a backbone for enhancing continuous improvement.

SGAs were formed which would operate for a maximum of six weeks. Improvements became visible fast; an important factor in maintaining motivation. "The pace at which the implementation traveled and improvements were made was, to many people, a shock in itself,” says ARV Group senior consultant Jeroen Verheijen.

Structural savings

By the end of the program, OEE at the two spray-driers and two packaging lines had risen by 20 – 40%. Waste had been reduced by 30%. Structural savings at the end of the twelve-month program amounted to € 2.7 million/year.

ARV Group did not leave the project until the underlying processes were firmly in place; as a result, the performance management system was safeguarded and firmly embedded within the supply point’s operations, including the role-development of Nutricia leaders and facilitators. Once these were anchored within the organization, this persistence and commitment helped to finally nail down the results.

Supply-Point Manager Gert-Jan Hoogers: "With the Clarity program we're writing company history, and that is quite an achievement, something we can all be proud of. The drive and motivation of the local MT was instrumental in making this project a great success as well. Clarity has facilitated the actual implementation of our Supply Point Master Plan, and so provides us with the competitive edge we strive for."